Overview
GB/T 17213.10-2025 brings several revisions to industrial valve type tests. This post walks through each change and gives hardware/software upgrade recommendations for test machines.
What It Means for Test Equipment
New standards and tighter customer requirements make accurate sensing, repeatable fixtures, automatic judgment and traceable data essential. A well-configured test system should capture the complete process and produce an auditable report.
Ouxun Recommendation
Ouxun engineers can review the product, test standard and required cycle time, then configure the appropriate pressure, flow, temperature, force or environmental modules. Existing equipment can also be upgraded in stages, from software and control cabinets to a complete test-system replacement.
